Contract description
The interior of the production hall was cleaned with a high-pressure water jet. Afterwards, the walls were treated with a penetrating coating and two coats of white topcoat were applied. Stairs and railings were also painted and the whole area was industrially vacuumed from residual dirt. The hall tower underwent a complete treatment with basic paint and then a double top coat.